Planning and Development

Development Contribution Payment

Development Management

Temporary Development Contribution Waiver Scheme - Closing 31/12/2024

The temporary extension period for the Temporary Development Contribution Waiver scheme was extended to include residential development that is commenced on site before 31st December 2024. As this date is approaching please note the important information provided below:

*Please note that the BCMS will not be operational from the 20th December 2024 to 1st January 2025. It is therefore advised that relevant “Commencement Notices” or “7 Day Notices” should be submitted on or before 17th December 2024 to allow adequate time for their processing (validation) as appropriate.*

Temporary Waiver Scheme in respect of development contributions

 

On 25 April 2023, the Government approved additional measures under the Housing for All Action Plan to incentivise the activation of increased housing supply and help reduce housing construction costs. These included the introduction of temporary time-limited arrangements for the waiving of local authority “section 48” development contributions and the refunding of Uisce Eireann water and wastewater connection charges.

The Temporary Development Contribution Waiver Scheme applies for 1 year to all permitted residential development that

  • Commences on site between 25 April 2023 and 24 April 2024, and is
  • Completed not later than 31 December 2025.

Extension to Temporary Waiver Scheme

 

On 30th April 2024 an extension to the scheme was announced as follows:

  • Development works on qualifying housing units shall commence not later than 31 December 2024;
  • The combined pre-existing waiver and refund arrangements shall continue in place for a further period of just over 5 months until 30 September 2024;
  • The water connection charge refund arrangements shall terminate on 30 September 2024 with the development levy waiver remaining in place on its own for the remaining 3 months of the year until 31 December 2024;
  • Claims for the levy waiver shall be submitted by developers to local authorities not later than 28 February 2025;
  • Requests for refunds of new water services connection charges shall be made to Uisce Éireann not later than 31 December 2024.

The date for the completion of development works on qualifying houses under the scheme is extended from 31 December 2025 to 31 December 2026. This completion date applies to all qualifying houses commenced since the introduction of the scheme, including those that have already commenced prior to the extension of the levy waiver and water charge refund arrangements as communicated in this Circular Letter.

 

Commencement Notice Submissions for Waiver Applications

 

Developers are required in accordance with the Building Control Regulations to submit “Commencement Notices” or “7 Day Notices” (where applicable) to the relevant local authority prior to the commencement of works on site. Commencement Notices should be submitted to the local authority 14 to 28 days before it is intended to commence the works. A Commencement Notice or a 7 Day Notice may be filed electronically on the Building Control Management System (BCMS).

 

It is an offence, under Section 16 of the Building Control Act to commence works in the absence of a valid Commencement Notice or 7 Day Notice.

 

*** Please note that the BCMS will not be operational from the 20th December 2024 to 1st January 2025, it is therefore advised that relevant “Commencement Notices” or “7 Day Notices” should be submitted on or before 17th December 2024 to allow adequate time for their processing (validation) as appropriate. ***

 

Eligible Categories

 

The waiver scheme will apply to all permitted residential development including multi- unit developments, self-build houses and one-off rural houses, student accommodation and sheltered housing.

Residential extensions or the refurbishment of existing vacant/derelict properties are not included in the waiver scheme as the measure is intended to help boost the delivery of new housing supply, address cost and viability issues faced by the construction sector and incentivise the activation of new housing commencements.

It should be noted that supplementary development contribution schemes which are in place under Section 49 of the Act are not included in the waiver scheme.

 

Procedures for claiming the waiver and recoupment.

 

Applicants (developers/site owners) for the waiver shall in the first instance submit a Development Contribution Waiver Scheme Application Form together with the commencement notice in respect of the development for which the waiver is being claimed. In the case of single unit developments, the date of commencement of works on the site should be indicated.

On receipt of an application form and associated commencement notice, the local authority will assess whether the development falls within the parameters of the scheme. Where a development is deemed to fall within the scope of the scheme, a waiver approval letter will issue.

Developers availing of the scheme will sign an undertaking form confirming agreement to comply with the said conditions of the scheme. This undertaking form includes details of the application of clawback/refund arrangements where conditions of the scheme are not met.

Queries relating to applications for the temporary waiver scheme can be addressed to  waiver@fingal.ie

Please find link to the relevant application form to be completed in order to apply for the Temporary waiver scheme - Contribution Waiver Scheme Application Form

 

The Council operates a Development Contribution Scheme to part fund the provision of public infrastructure and facilities in the county.  All planning permissions are subject to this scheme, including permissions granted on appeal by An Bord Pleanála, unless exempt in accordance with the provisions of the scheme.

It should be noted that from 1st January 2025, the Development Contribution Rates shall be as follows:

  • Residential Levy                  €132.68 m2

     
  • Commercial Levy                €103.61 m2

     
  • Residential Retention        €165.85 m2

     
  • Commercial Retention      €129.51 m2

These rates of development contributions are payable to the Council in respect of the three classes of public infrastructure referred to under Article 9 of the Development Contribution Scheme 2021 – 2025, adopted by the County Council at its meeting held on 14th December, 2020.  An additional contribution is payable to Irish Water in respect of public infrastructure provided by them.  Developers should contact Irish Water directly in this regard.